You live in Karachi and need a new electricity connection, but don’t know the process. This guide will give complete information about the K-electric new connection from online application to meter installation in an easy and simple way. It will also guide how to submit the online application, including required documents, sanctioned load, new meter installation, application tracking, and new meter connection charges. Already have a K-Electric connection? You can easily check your KE Bill online.
Step-by-step process for installing a K-Electric new connection
The process of getting a new KE meter is simple. Just follow the steps below.
Step 1: Online Application Form
Visit the official K-electric new connection portal, fill out the new meter connection form, and provide all the necessary information.
Before submitting the form, make sure all information is correctly entered. Before applying for a new connection, it is a good idea to understand the latest K-Electric Unit Price and tariff structure.
Step 2: Document Upload
For the K-Electric new connection, submit clear and scanned copies of the following documents:
After uploading the documents, K-Electric will start the document verification process before moving your application to the next stage.
Step 3: Fee Payment
After uploading your documents, pay the processing fee online.You can choose from the available online and offline payment options to complete the payment
Once your connection is installed, you can use the KE Bill Calculator to estimate your future electricity bills based on monthly usage.
Step 4: Site Survey
After paying the fee online, the K-Electric technical team will do a site survey within 3-5 working days for inspection.
Step 5: Final Payment & Installation
After survey approval from the K-electric.
K-Electric New Connection Tracking (Application Status)
After submitting your application, the consumer will receive a unique Case ID and Password.
Case ID: A unique tracking number issued after submitting your application. You can use this Case ID for application tracking and checking your new connection status.
Password: It will be sent to your registered mobile number via SMS.
How to Track:
K-Electric New Meter Connection Charges 2026
If you are applying for a new connection, the charges will vary depending on whether it is for a home or a business. These charges will vary depending on
Residential Connection Charges
| Home Size | Electricity Load | Estimated Cost | Meter Type |
|---|---|---|---|
| Small Home | 1-3 kW | Rs. 10,000 -15,000 | Single-Phase |
| Medium Home | 4-7 kW | Rs. 15,000 – 25,000 | Single-Phase |
| Large Home | 8-15 kW | Rs. 25,000 – 50,000 | 3-Phase |
Note: These charges are only an estimate. The actual cost may be higher or lower depending on your connection requirements.
Commercial Connection Charges
| Business Type | Electricity Load | Estimated Cost |
|---|---|---|
| Small Shop or Office | 3-5 kW | Rs. 20,000 – 35,000 |
| Restaurant or Salon | 10-20 kW | Rs. 50,000 – 100,000 |
| Large Business or Commercial Building | 20+ kW | Rs. 100,000+ |
Note: These charges are only an estimate. The actual cost may be higher or lower depending on your connection requirements.
Load Categories
| Connection Type | Maximum Load |
|---|---|
| House | Up to 80 kW |
| Apartment / Multi-Story Building | Up to 40 kW |
| Industrial Connection | Up to 80 kW |
| Commercial Connection | Up to 25 kW |
| Agriculture Connection | Up to 15 kW |
| Temporary Connection | Up to 25 kW |
Reasons Why Applications Get Rejected
Your meter application may be rejected for the following reasons:
Solution: Application rejection will be received via SMS. Address the issue and reply to this within 30 days. If you’re taking ownership of a property with an existing KE meter, consider applying for a bill name change instead of requesting a new connection.